LScarpentry
  • Home
  • Projects
  • Designs
  • Kitchen
  • Bath
  • Before Pictures
  • Contact / Request References
  • Field Notes
  • Reviews
  • Resources

Finishing today!

1/31/2011

0 Comments

 
Met with the homeowner of the duplex project we've been working on since early December yesterday and confirmed a punch list of final items to be completed.  It's a very short list and should be very easy to take care of today.  Tomorrow will be about final clean up and trash removal.  I'll be sure to take some pictures of everything when it's nice and tidy to post on the Projects page, but here are a couple of shots I took yesterday.
Picture
This is the kitchen in the rental unit. The cabinets are all the existing ones which were removed and reused. The wall where the window is was originally a sliding glass door. The wall to the right now separates the two units.
Picture
This is the tub surround in the owner's unit. A large window was removed and reframed for the small slider. The homeowner is doing his own tile floors and countertops, but chose to have us provide tile labor for the more demanding tub surround and tile base. The work was performed by Quality Floors, LLC who also did the tub surround on the bathroom we recently did in West Seattle.
Picture
A 6-0 (six foot wide) sliding glass door was removed here, the wall refamed and a 5-0 full lite double fiberglass door installed
After this there are only a couple of small jobs confirmed, although there are several bids still pending, so this is a great time to get ahold of us to discuss whatever home repair or improvement projects you've got in mind.


Call Scott today!  206.300.5891  [email protected]
0 Comments



Leave a Reply.

    Picture
    View my profile on LinkedIn

    RSS Feed

Powered by Create your own unique website with customizable templates.